Find everything that depends on the existing connection
List the public number, any extensions, broadband arrangement and devices using the line. Ask the equipment supplier about compatibility before replacing a connection. Do not assume that because a handset works, every device connected to the old service will work in the new setup.
Ofcom’s digital-landline guidance explains the move toward phone services using broadband and highlights dependent equipment and power considerations. Google Voice is one possible business software and telephone arrangement, not the name for every UK landline upgrade. Confirm who supplies each component in your proposal.
Choose a Google or carrier-supplied telephone service
Starter is not eligible for SIP Link. If the shop does not own or plan to manage a suitable SBC, do not select that route just because it sounds like keeping the old carrier. Compare Carrier Link and the Google calling plan against the actual responsibilities and supplier offers.
| Route | Telephone supply | Setup decision |
|---|---|---|
| Google calling plan | Google provides supported numbers and calling. | Managed account, locations, licenses and assignment. |
| Carrier Link | A certified carrier partner provides a preconfigured service. | Confirm the concrete UK offer and partner support. |
| SIP Link | Your carrier connects through a certified SBC. | Standard or Premier plus infrastructure and technical maintenance. |
Separate a new allocation from a port of the old shop number
Ask the receiving service to check the exact active number, number category, current provider and coverage. Google’s direct porting requirements have exclusions and require the existing service to remain active until completion. Being in a supported country does not approve every number or every transfer.
For a carrier-managed route, obtain that carrier’s transfer instructions instead of assuming the direct Google process applies unchanged. Ask what happens to any bundled service and the other equipment listed in your inventory. Record the agreed cutover and a fallback; avoid an unsupported cancellation-first sequence.
Decide what happens when power or broadband fails
Discuss emergency access and important incoming enquiries for the real premises. Ofcom highlights that digital phone services depend on power and that people relying on a landline need an appropriate arrangement. Ask the selected supplier about the particular product rather than assuming every cloud app behaves like a traditional powered line.
The shop’s pilot should include an unavailable worker, a missed booking call and recovery after a network interruption. Check the intended handset or app, not just a laptop demonstration on another network. Tell staff which existing fallback to use and who can change the call routing.
Compare the managed offer and a complete operating month
Google’s personal Basic and standalone single-user offers are US-only; they are separate from the managed UK business route. Confirm required users and the edition’s actual group, attendant and record features. A familiar consumer signup tutorial is not a complete business setup plan.
Add software, numbers, calling, broadband, devices, implementation, taxes and any carrier commitments for the same month. Verify messaging separately and check actual destination prices before assuming international calls are included.
26sim’s current US service forwards and starts callback through an existing verified US phone. It does not supply browser audio, UK local inventory, shared queues or website porting. Its separate US contact workflow does not replace the shop’s UK line and equipment review.
Common questions
Is a UK digital landline upgrade the same as buying Google Voice?
No. The digital connection, telephone supplier, number and calling interface must be identified in the actual proposal.
Can Starter use SIP Link in the UK?
Google’s current route note requires Standard or Premier for SIP Link.
Should the old line be canceled after a successful demonstration?
First confirm number transfer, dependent equipment, necessary service checks and the continuity plan. A demonstration is not a completed changeover.